Getting Your Business Visual

One of the most difficult phases of improving business efficiency is implementing a visual workplace. We have all seen the isolated examples that consultants and academia recite but getting the correct systems in place for your business environment is essential. Do not adapt huge expense in getting the methods in places in their infancy of the conversion, but place simple methods that may require more administrative effort during development. Visual systems tend to evolve as the workforce becomes familiar with them and offer suggestions.
The most important visual systems are ones that show what is expected for outputs. You may want to simply invoke a white board that is updated daily with an indication of what is expected daily. As your system develops, you will include meaningful metrics of performance. This can be, but not limited to, a weekly output, monthly output, year to date outputs, efficiencies, productivity etc. The workforce will tell you what is meaningful to them and that which allows them to know how they are performing. Most industries show do not go beyond monthly information at this stage and save the year to date performance for all-hands meetings. If is essential that the posted information is meaningful. The system should evolve to a visual display of takt time versus performance. There are several digital displays that allow people to hit a toggle a button or switch every time a deliver is made. Either the lead or supervisor in the area can administrate the takt time. This allows a real time display of performance that is accurate to the minute.

Another vital part of the visual system is an Andon light. This is an indicator of two elements. The first is the performance obstacles in the cell. A red, yellow, green light display is easy to understand. A green light may indicate the work cell is on target and all assets are running correctly. A yellow light indicates that takt time cannot be met but all assets are running correctly. A red light that indicates there is an asset problem or material shortage that is slowing of shutting the cell down. The yellow light indicates that manufacturing or industrial engineering needs to speak with the cell for changes and/or resolution. The red should require that management, your maintenance group, or engineering needs to expedite resolution. It is essential that we react to those lights expeditiously because the lack of response will evolve a culture suggesting that the light is not valuable and executing the visual signal is therefore useless. The second type of Andon light is usually used in an assembly environment. This light would be a digital readout of any parts holding up the production of a cell creating delays and wait time. This light requires that communications be made to the cell and timelines associated with resolution be developed. None of these lights should get turned off or returned to green unless the issue is totally resolved or parts are now on hand. These lights should be periodically reviewed by dedicated personnel and certainly reviewed during a daily Gemba walks.

The next part of a visual workplace is a visual workflow. A hospital may put different stripes on the floor so that everyone understands where to go. It also can be signage that shows the steps or stations in a process. This allows everyone to identify workflow and observe any bottlenecks. This is easy to accomplish in a standardized high volume tasking but can be more contrived in a mixed model or tasking flow. However, they are all attainable and easy to implement.

Finally, we need to create Kanbans, Heijunka box or wheels, or other visual signals to accommodate lean pull and overproduction elimination. As we progress through lean, we will continue to reduce inventory and waste through more efficient methods of lean tool usage. There are many other tools and methodologies that can be implemented. Educate your workforce and empower them to implement what is the most effective communication methods for good productive flow and waste elimination. They know the processes and know what will indicate to them their performance. Enjoy the process and admire your workforce’s knowledge of lean implementation. They will make your system successful if you engage and empower them.

Leaning Out a Mixed Model Assembly Line

One of the more challenging industries to get lean is the mixed model, made to order, assembly production lines. We all have read the success in high volume production lines with options but what if you are producing several distinctly different products on the same line. It becomes a challenge as each station needs to be level loaded for the processing time so the overall cycle time remains consistent. There are several pieces of ground work that must be accomplished prior to any indoctrination of lean processing. While this may seem like a huge task that will take significant time to complete, the manager must remember the basic elements of success – a vision and a strategic plan that states which product line is approached first. Your vision should state what the perfect production line would resemble and the plan will state the cadence of products and the sub-steps to completion. You must remember that cellular or assembly processing must call for the same processes to be followed each time a product is produced. Repetition makes it easier to control quality and also allows you to track whether improvements have a positive or negative effect.
1. Value stream map each assembly
2. Create sub assembly operations and co-locate them to the line in a balanced process and cycle time
3. Break out and balance the tasks
4. Layout inventory, tools, workbenches so that tasks can be eventually and linearly be produced
5. Create inventory feeder line strategies and kits for common sub-assembly operations
6. Define and set in place Standard WIP
7. Create standard work
8. Determine the proper spacing in the flow. Make every a incorporate a “U” shaped cell (Rabbit Chase)
9. Cross train operators
10. Create standard work for the “load versus operators” necessary to meet Takt time
11. Determine the vortex operations and assure that all operators are trained in these operations
12. Assure that there is contingency planning for excess load and equipment failures

While these are not the only elements that must be addressed they are the basics for your journey’s inception. Do yourself a favor and benchmark other and similar industries. Most manufacturing facilities are eager to share their successes and you will not be re-inventing your entire operation as you can use the “Best in Class” practices. You must remember that this is not easy and you will never be complete in your leaning of the lines. After each iteration, you will discover new avenues for improvement.